LH1299 : 2" New Construction (Non-IC) (12V MR16)

Description

5 1/2" minimum clearance above ceiling recommended for installation and maintenance access. Can be used for remodel applications as well.

Available Features ?

Available Features

Based on the option chosen these features will be available. Please check the webpage and specification sheet to ensure the particular feature applies to your product.

  • Damp Location
  • ETL LISTED
  • 120V
  • 277V

Order Configurator

You can not select this item

* Required Fields

Availability: In stock